Are you able to cut the need for offside-supply in existing buildings? Are you ready for the #procu100re renewable energy supply challenge? Six cities and regions are looking for R&D solutions to change the approach of building renovation. We are following a pre-commercial procurement (PCP) approach and challenging those suppliers that can respond to our needs. The total funding amount to be divided among the selected suppliers throughout the whole challenge-based procurement is 7.68 million euro.
100% renewable energy
Schools and Offices
7.68 million € for R&D
6 PROCURERS FROM
6 COUNTRIES
[Phase 0]
The Open Market Consultation (OMC) represents a specific phase during the overall Pre-Commercial Procurement preparation. The objective is to actively approach the market to learn more about the state-of-the-art, as well as about envisaged future developments on operating buildings only with renewable energy. A series of OMC events will be organised and announced in section events, newsletter etc.
[Phase 1]
[Phase 2]
The Development of Prototype phase is an 8-month phase in which four contractors refine and increase the level of detail of their designs and organise tests
of all user-facing ICT-systems. The design level is as detailed as possible without the requirement to
constitute construction drawings. Planning and calculations should be final. The use of the Co-Design procedure should be intensified. This phase aims to turn the schematic design
to detailed designs preparing all parties involved for rapid implementation; and to give future users the opportunity to test all ICT-systems. The total procurement budget in Phase 2 will be 2.3 million euro.
Phase 3
The procuRE Timeline
Learn more details about the procuRE PCP Phases HERE.
December 2020 - October 2021: Prepraration phase
November 2021 - March 2022: Call for Tender
Concept design, solution architechture, technical specifications and assessment framework
Development of prototype systems: design level is as detailed as possible, planning and calculations are final
Deployment and testing of the solutions: designs are turned into construction drawings, the solutions are installed, made operational, maintained and performance data collected
Meet the partners
procuRE brings together 6 procurers from 6 countries to jointly tackle the common challenge of achieving 100% Renewable Energy Supply in existing public buildings